• Home
  • Blog
  • Case study | Safety on Track at Bergshamra

Case study | Safety on Track at Bergshamra

Case study showing how Prismo Preform was used to create a highly visible and durable safety system at a Swedish metro station.

by Prismo Team
27 October 2025
Case study | Safety on Track at Bergshamra
Rainbow street crossing made from Prismo preformed thermoplastic road markings in Sheffield, photographed at night.

Rainbow

this is the photo of a rainbow marking

Get started

Case study showing how Prismo Preform was used to create a highly visible and durable safety system at a Swedish metro station.